Ingersoll · Parks, recreation & culture
A professional advisor who will guide the Town through the planning and execution of the MURC A live browser visit returns Page Not Found. Search retrieval still exposes a cached December 2025 project page. That old timeline or on-budget badge is not current project progress.
Ingersoll
Current project progress unverified; official page unavailable- Revised budget
- $290,000
- Named supplier
- Interkom Inc.
- Next target
- No next date listed
- Latest update
- 2026-10-30 · MURC source link remains unavailable
Open project →Ingersoll · Roads & bridges
The lands designated through the Town of Ingersoll Secondary Plan for the new Multi-Use Recreation Facility are currently unserviced. The Secondary Plan indicated that servicing would be enabled through the extension of water and sanitary sewers from Walker Road. Through preliminary investigation it was determined that sufficient grade is not available to enable this servicing scheme, and instead, servicing is to be extended from Harris Street. To service the lands with sanitary sewer from Harris Street via gravity feed, approximately 3 m± of fill is required in order to remove the existing sag in the road. This additional loading requires replacement of the existing culvert C 16 on Clark Road, initially slated for replacement in the 2026-2030 time horizon. Thus the total scope of work on Clark Road to service the MURC lands includes: Water and Sanitary Servicing, Storm Sewers, addition of 1 eastbound lane (total 3 lanes), sidewalks (or Multi-Use Trail), Streetlighting. A Class D (±20% accuracy) enabling works estimate was provided by Dillon Consulting amounting to $12,700,000. This estimate may reasonably be reduced to $8,500,000 though further design considerations relating to Hydraulic Conductivity of Halls Creek, and subsequent Geotechnical Investigation to confirm subgrade adequacy for structural footing design. Additional to this work will include the engineering design and contract administration estimated at 10% of construction value from the Class D estimate. A live browser visit returns Page Not Found. Search retrieval still exposes a cached December 2025 project page. That old timeline or on-budget badge is not current project progress.
Ingersoll
Current project progress unverified; official page unavailable- 2026 allocation
- $262,000
- Next target
- No next date listed
- Latest update
- 2026-10-30 · MURC source link remains unavailable
Open project →Ingersoll · Parks, recreation & culture
The Town-hosted January 2026 status report says the design-build contract with Ball Construction was signed following Council approval. The exact signing day and executed agreement were not reviewed. This dated report does not establish current construction progress or opening.
Ingersoll
Design-build contract reported signed; current construction progress unverified- Lifetime project budget
- $38,000,000
- Next target
- No next date listed
- Latest update
- 2026-10-30 · October 30 webpage availability check
Open project →Ingersoll · Parks, recreation & culture
Through completion of the Clark Road Urbanization and service extensions, water and sanitary sewer will be available to the designated MURC lands. Internal grading and servicing design will allow in-progress institutional development for a long-term care facility, new elementary school, and the MURC to be completed and leave a balance of 20±acres for residential development. The scope of work for the internal grading and servicing will include topsoil stripping for the impacted lands, earth cut and fill, water, sanitary and storm sewer construction, and was all road building, streetlighting and sidewalks constructed to the MURC facility. Grading works will allow the MURC to commence construction while Clark Road is being reconstructed. Servicing and internal road-building can take place following Clark Road reconstruction and before the MURC grand opening. A Class D (±20% accuracy) estimate was provided by Dillon Consulting amounting to a constructed value of $8,323,405. Additional to this work will include the engineering design and contract administration estimated at 10% of construction value from the Class D estimate. A live browser visit returns Page Not Found. Search retrieval still exposes a cached December 2025 project page. That old timeline or on-budget badge is not current project progress.
Ingersoll
Current project progress unverified; official page unavailable- 2026 allocation
- $8,424,000
- Next target
- No next date listed
- Latest update
- 2026-10-30 · MURC source link remains unavailable
Open project →Ingersoll · Parks, recreation & culture
The MURC project involves ongoing oversight and coordination and administration required to complete the MURC. A live browser visit returns Page Not Found. Search retrieval still exposes a cached December 2025 project page. That old timeline or on-budget badge is not current project progress.
Ingersoll
Current project progress unverified; official page unavailable- 2026 allocation
- $250,000
- Next target
- No next date listed
- Latest update
- 2026-10-30 · MURC source link remains unavailable
Open project →County · Roads & bridges
The published update schedules a November winter pause, reopening with an all-way stop over winter and resumption in early 2027. The notice gives a planned reopening, not confirmation that the road reopened.
Ingersoll
November winter pause planned; work resumes early 2027- 2026 allocation
- Not established
- Named supplier
- J-AAR Civil Infrastructures Limited
- Next target
- 2026-11 · Planned winter pause and reopening
- Latest update
- 2026-10-22 · Winter-pause schedule published
Open project →Ingersoll · Roads & bridges
Crfwd - 3 Year Bridge Rehab Design Program
Ingersoll
In Progress- 2026 allocation
- $76,000
- Next target
- No next date listed
- Latest update
- 2026-06-30 · Spending reported through this date
Open project →Ingersoll · Other projects
Crfwd - Earl St Reconstruction (Ann St to Frances St)
Ingersoll
In Progress- 2026 allocation
- $10,000
- Next target
- No next date listed
- Latest update
- 2026-06-30 · Spending reported through this date
Open project →Ingersoll · Other projects
Crfwd - Frances St Reconstruction (Merritt St to Wonham St South) Topcoat
Ingersoll
Procured- 2026 allocation
- $42,000
- Next target
- No next date listed
- Latest update
- 2026-06-30 · Spending reported through this date
Open project →Ingersoll · Buildings & facilities
Crfwd - Hall's Creek Retaining Wall Replacement
Ingersoll
In Progress- Revised budget
- $280,000
- Named supplier
- Hohol Enterprises One Limited
- Next target
- 2026-10 · Plannedcompletion
- Latest update
- 2026-06-30 · Spending reported through this date
Open project →Ingersoll · Parks, recreation & culture
Crfwd - Memorial Park Bandshell
Ingersoll
Completed- 2026 allocation
- $180,000
- Next target
- No next date listed
- Latest update
- 2026-06-30 · Spending reported through this date
Open project →Ingersoll · Other projects
Crfwd - Pemberton St Reconstruction (CNR Tracks to North Town Line)
Ingersoll
Not Started- 2026 allocation
- $10,000
- Next target
- No next date listed
- Latest update
- 2026-06-30 · Spending reported through this date
Open project →Ingersoll · Other projects
Crfwd - Stormwater Management Strategy Update
Ingersoll
In Progress- 2026 allocation
- $51,000
- Next target
- No next date listed
- Latest update
- 2026-06-30 · Spending reported through this date
Open project →Ingersoll · Other projects
Crfwd - Wonham St South Reconstruction (King St to Ann St)
Ingersoll
Procured- 2026 allocation
- $141,000
- Next target
- No next date listed
- Latest update
- 2026-06-30 · Spending reported through this date
Open project →Ingersoll · Other projects
Crfwd - Wonham St South Reconstruction Phase I (Ann St to Melita St)
Ingersoll
In Progress- 2026 allocation
- $937,000
- Next target
- No next date listed
- Latest update
- 2026-06-30 · Spending reported through this date
Open project →Ingersoll · Other projects
Crfwd -SWM Pond Asset Performance Assessment and O&M Manuals
Ingersoll
In Progress- 2026 allocation
- $50,000
- Next target
- No next date listed
- Latest update
- 2026-06-30 · Spending reported through this date
Open project →Ingersoll · Buildings & facilities
Crfwd -Town Hall - Elevator replacement
Ingersoll
In Progress- 2026 allocation
- $200,000
- Next target
- No next date listed
- Latest update
- 2026-06-30 · Spending reported through this date
Open project →Ingersoll · Parks, recreation & culture
The 2024 OSIM inspections identified priority need for maintenance and replacement of Town bridges and culverts exceeding 3 m in diameter. The priority structure maintenance and replacement designs identified by the 2024 OSIM Inspections are for Structure B 22 (Memorial Park over Halls Creek) fo repair of retaining wall and provide erosion protection. Repair deck end cover plates and members with section loss
Ingersoll
In Progress- 2026 allocation
- $40,000
- Next target
- No next date listed
- Latest update
- 2026-06-30 · Spending reported through this date
Open project →Ingersoll · Water, drainage & wastewater
The project involves the field topographic survey and subsequent storm drainage solution to intercept storm runoff from the Butternut Park that currently traverses the existing residential lots to the east causing drainage issues and icing conditions on the sidewalk during the winter months. The work will involve the implementation of a swale/ditch to intercept surface runoff and direct this surface flow to a piped storm sewer.
Ingersoll
In Progress- 2026 allocation
- $30,000
- Next target
- No next date listed
- Latest update
- 2026-06-30 · Spending reported through this date
Open project →Ingersoll · Buildings & facilities
The 2024 OSIM inspections identify priority needs for maintenance and replacement of Town bridges and culverts exceeding 3 m in diameter. The priority structure maintenance and replacement designs identified in the 2024 OSIM Inspections are for Structure C 18 (Centennial Lane over Halls Creek) for full replacement.
Ingersoll
In Progress- 2026 allocation
- $400,000
- Next target
- No next date listed
- Latest update
- 2026-06-30 · Spending reported through this date
Open project →Ingersoll · Roads & bridges
The Transportation Committee received a request for an additional streetlight on Caffyn Street, NE Leg. Town Engineering staff reviewed the area together with ERTH and find that following conventional street lighting, an additional light is warranted.
Ingersoll
Procured- 2026 allocation
- $20,000
- Next target
- No next date listed
- Latest update
- 2026-06-30 · Spending reported through this date
Open project →Ingersoll · Other projects
Town constructed capital projects generally carry a 2-year warranty and maintenance period. Often, when warranty works are discovered there may be additional costs involved to alter works of varying degrees to provide a better long term solution as opposed to what was initially built and designed. Accommodating an annual allowance will allow such undertakings to be considered on an as needed basis, together with capital warranty work when required.
Ingersoll
In Progress- 2026 allocation
- $10,000
- Next target
- No next date listed
- Latest update
- 2026-06-30 · Spending reported through this date
Open project →Ingersoll · Other projects
The project involves the replacement of Cast Iron watermain with new PVC watermain, and replacement of sanitary sewers on Charles St from Whiting St to Merritt St by the County of Oxford. Roadworks have a current 63.6 (out of 100) rating making this joint project cost effective for collaborative undertaking. Timescapes camera system will be utilized during construction to monitor construction activities. This is a joint project with the County of Oxford. Length of project is ~410 l.m.
Ingersoll
Not Started- 2026 allocation
- $45,000
- Next target
- No next date listed
- Latest update
- 2026-06-30 · Spending reported through this date
Open project →Ingersoll · Roads & bridges
The project involves the replacement of cast iron watermain and sanitary sewer with new PVC piping by the County of Oxford. The Town will replace storm sewers identified by asset management in the roadway. The existing road width will remain the same but new curb and gutters will be placed. New sidewalk will replace the below standard walks currently on the right of way. This is a joint project with the County. Timescapes camera system will be utilized during construction to monitor construction activities Length of project is 150 l.m.
Ingersoll
In Progress- 2026 allocation
- $25,000
- Next target
- No next date listed
- Latest update
- 2026-06-30 · Spending reported through this date
Open project →